We are waiting for moldings and counters for the kitchen, which has slowed down the inside work on the house, so they have been working outside and wow does that stuff get done fast once the trim work is complete! The pictures below are from Thursday as they were working on the side, but by quitting time Friday the entire new addition was complete right down to the fascia and gutters. I was a little nervous about the colours as you only get a small swatch to choose from, but I'm so pleased with the siding - it looks even better than I hoped. I can't wait to see the whole house done.
 |
| West wall of addition (11/03/2011) |
 |
| North wall of addition (11/03/2011) |
In other news the floor sealer that the tile company gave us to try on the floors did not have the desired effect unfortunately. So they are sending the contractor back out to fix the floors. They actually came today and finished the floors, sealed and all and they look great - more on that tomorrow once the sealer is dry and I can get in there to take pictures.